BIM DESIGN

BIM DESIGN

The fundamental difference between fitting out and designing

lies in the mindset and strategic vision behind every action. Fitting out simply means installing predefined elements, whereas designing involves an in-depth analysis of needs, careful planning and constant attention to sustainability and efficiency.

THE PURSUIT OF PERFORMANCE

At R&PRO we believe that only targeted, conscious design can create production systems that truly perform and last, capable of sustaining a business’s success over time.

that goes beyond appearances to build solid operational foundations.

From 2D to 3D with integrated building services – cooking island for a culinary school, 2 workstations
Hayes – London: facility delivered in about 8 months thanks to integrated BIM design. Now in full production, the project benefited from strong support from the client, who took an active part so that development and delivery could be fast.

THE NUMBERS

Figures show that the 6–8% of costs related to design determines as much as 75% of the total value of a contract. An extraordinary leverage effect, showing that the design phase is not a mere technical step but the real driver of profitability.
Why such a decisive influence?
Because design is not limited to the time spent thinking and drawing in CAD, Revit and BIM platforms.


Design is the beating heart of the contract

Design is:

  • the critical point for gathering and interpreting the client’s needs;
  • the key phase for turning requests into efficient executive solutions;
  • the control point that determines the cost, time and quality of the whole process.

This is where the technical office shows its strategic value, becoming both executor and director of the whole contract, from cost forecasting to operational management.

Investing in effective design is not an expense, but the most powerful profit multiplier available to a company.

We design the facility around the client’s performance targets and budget, with no brand ties: the equipment is chosen by the project, not by the catalogue.

United Kingdom – industrial building developed with BIM methodology
integrated design: architecture and building services
Preliminary study: production laboratory for women entrepreneurs, with an integrated company nursery