why assessing a market with an independent approach matters, especially in the Food Industry

The market premise
When a market shows receptiveness to a food product — growing demand, significant imports, rising per-capita consumption, or simply a gap between what consumers look for and what is produced locally — that signal is not a passing opportunity, it is a structural indication. The market is already paying for that product: the demand exists, it just needs to be captured closer to the source.
Why local processing is the winning choice
- Margin along the chain: those who import the finished product capture only the last link of value. Those who process locally capture margin on raw materials, process, packaging and distribution.
- Logistics resilience: producing where products are consumed reduces exposure to supply-chain shocks, tariffs, currency fluctuations and transport times — variables that weigh more today than in the past.
- Freshness and shelf life: for many food categories, proximity of production means higher perceived and real quality (closer to the field, closer to the table), a defensible competitive advantage.
- Employment and institutional relations: a local plant creates related activity and jobs, and opens the door to public incentives, tax relief and partnerships with the local agricultural supply chain.
- Brand scalability: those who control production also control the narrative, certifications and traceability — levers increasingly demanded by consumers and large retailers.
The necessary condition
All this holds only if market receptiveness is rigorously validated: feasibility study, analysis of real vs. potential demand, benchmarking of local competition, plant costs and regulatory compliance (HACCP, health authorisations, local regulations). This is where the plant turns from an idea into a bankable investment.
THE DAES METHOD
Dynamic Analysis of Economic Sustainability
DAES is the methodology we developed for sizing hospitality and food-service facilities. It is not an evolution of the business plan, but a completely different approach: where traditional analysis takes a static snapshot of the facility, DAES dynamically analyses its economic flows and work flows as they happen.
Sizing therefore stems from a dynamic analysis of the service structure. Covers, menu and running costs are instead covered by our business intelligence analysis.
1. ESTIMATES: PREMISES, BUSINESSES AND TECHNICAL EQUIPMENT


2. technical feasibility study
Can I do what I want to do in the premises I have found?
and if not… what minimum features must my premises have to support my project?
THE DECISION PATH
Detailed technical assessment
Preliminary analysis: size, building features, planning context, local regulations, building services, required permits
Economic study
Preliminary design, preliminary cost estimates needed to develop the project. Financial capacity, payback, public and private funding.
Cost control at start-up
Final design, production line sizing, production capacity, ability to recover the investment
Cost control at full operation
Control of production costs after the plant or venue opens, with flow analysis and any adjustments needed along the way
3. PRODUCTION LINE SIZING



Phase One: Preliminary Analysis
In this initial phase, key technical and economic data are collected to define requirements and set an effective strategy for delivering the project.
Phase Two: Sizing
Here the size of the production lines is calculated and optimised, balancing production capacity and cost control.
Phase Three: Economic Assessment
economic sustainability
In this phase costs and benefits are analysed, ensuring the project’s financial sustainability before it goes into operation.